•Profile
 
  Organisation Information
  History
  Who's Who
  From The Gallery
Transport
  Bus Transport Profile
  Landmarks
  Organisation Setup
  Facilities Provided
  Hire a Bus
  How to Advertise
  Help Line
  Key Persons
  New Projects
  Awards
  Route Network
  Download Traffic Manual
  Transport Engineering
Electricity
 Regulatory Matter
 Electricity Profile
  Landmarks
  Organisation Setup
  New Connections
  Billing Centers
  Billing Procedure
  Restoration of Supply
  Receiving Sub-Station
  110 kv 33 kv 22 kv
  Energy Consumpt'n Chart
  New Projects
  Bills Online for-                     -Agreemental Consumers
  Internal Grievance
   Redressal Cell :
  English or Marathi
  System Reliability Indices
  Scheduled of Charges
 • Recruitments
 • PRC Reports
  (PRC Reports (June 2004) - DOWNLOAD)



Right To Information Act,2005.
 
 
• FAQ's
Electricity Transport
• Help
P.R.O
Electricity
Transport
 Download
Application Forms

Departmental Manual
 Sitemap
Find Quick Info.
 home



 

What should I do to increase load in my premises?
You have to approach the ward offices of the Commercial Division & submit a prescribed requisition form. You will be permitted to use additional power after meeting of compliances like Test Report, deposit & installation of higher capacity meter if required by BEST.

How can I improve power factor?
The power factor can be improved by installing capacitors. You have to approach a authorized Licensed Electrical Contractor to carry out the work of Capacitor installation.

What are C1 & C2 tariffs?
C1 and C2 are commercial tariffs. However in C2 tariff the KWH and RKVAH units are charged separately. This helps in reducing the bill amount if the power factor is maintained high

What is a Compact Fluorescent Lamp (CFL)?
It is a special lamp, which delivers more lumen output at less watts. Compared to ordinary tungsten filament lamps for the same wattage. Example: 11 watts CFL is equivalent to 60 watts ordinary Tungsten Filament lamp.

Will CFL reduce my electric bill?
Yes, because for the same illumination level less wattage CFL can be used.

Is it necessary to install earth leakage circuit Breakers (ELCB) ?
Earth leakage circuit breakers, are circuit breakers which trip at very small leakage currents from defective appliances. ELCB is necessary to protect us from electric shocks. It is mandatory for all 3 phase loads & loads above 5 kW.

What safety precautions should be taken to avoid accidents?
Check wiring of your premises, if it is deteriorated get it replaced by authorized Licensed Electrical Contractors only.
Electric meter room should be waterproof and well ventilated.All appliances should be properly grounded.
ELCB’S should be provided on the wiring installation.

What is the minimum space required for establishing a sub-station?
The minimum standard requirements of space for establishing a sub-station is space of 8 meters by 5 meters, approximately 40 square meters.